McDuffie Coal Terminal Dock 1 Expansion
CMG provided design services for the Dock 1 Expansion at the Alabama State Port Authority, McDuffie Coal Terminal. The expansion included the procurement/relocation/modification of a 6000 tph Dravo Stacker Reclaimer from Terminal 5, Port of Portland. The project also included a barge loader, a unit train loadout station capable of loading a unit train in less than 4 hours and over 4000 linear feet of 72" belt conveyors. The project also utilized over 100 tons of recycled structural steel from the abandoned DRI facility.
Home
Projects
History
Engineers
References
CMG Office
Contact Us
cmga_dec_2020007001.gif
BACK